This replacement bathroom was installed in Clayton Mead, Godstone in March 2017. The bathroom, chosen by the client, was installed in an existing bathroom space but was all new fixtures and fittings.
This replacement bathroom was installed in Clayton Mead, Godstone in March 2017. The bathroom, chosen by the client, was installed in an existing bathroom space but was all new fixtures and fittings.