This job was a small downstairs cloakroom that required an overhaul. A new floor was installed, along with furniture, toilet and wall hung vanity unit. The job was completed in September 2017.

This job was a small downstairs cloakroom that required an overhaul. A new floor was installed, along with furniture, toilet and wall hung vanity unit. The job was completed in September 2017.